sllogo-B1T
Latest LSR Updates
Page 1 of 55
FirstNextPreviousLast

2-20- Prepared the 4 cam cover to be rssined cast onto a plate to make a holding fixture for machining and knowing where the edges are in relationship to anengine case bolts, Thanks to my blue prints.
2-20 Finished the front wheel covers today and packed the box ready to ship to the sweat lodge in Minnesota. Packed the harness items, hardware for steering, 2 tubes of fire caulk, ez-access ankle restraint, 2 lengths of bent angle for mounting bulkhead clips.
2-12-10 Here is a nomex steering linkage boot with an SFI number and a 2008 date. Figured to use this on our front bulkhead with the steering linkage as it exits cockpit. Will need a ring cut out to mount it , but should do the job
2-8-10 And the back side as well.
2-8-10 We have a new T shirt we are selling to raise funds to go to BUB this year., Gray short sleeve with printing on back, Size M,L,XL, XXL. $20 a shirt and $4 shipping, USA, $6 foreign shipping

FirstNextPreviousLast
Page 1 of 55
vitrp15002
[Main] [LSR Updates] [LSR Attempt] [Koslo OHV] [New Parts] [Indian Parts] [War Path] [Racing Parts] [Contact Us] [GuestBook] [Pictures] [Contributions] [Posters] [Hand Grips]

Some graphics and text within this website are © Copyright 2000-2010 by IronWigwam.com
All rights reserved. Last Update: Saturday, February 13, 2010
Questions/Comments, Send E-Mail to: webmaster@ironwigwam.com